Demo. This is a one page demo of what a larger site would look like.Get a site like thisSee all designs
(972) 555-0118
Crew on a boom lift spraying fresh paint on the stucco wall of a Plano office building

Office, Retail and HOA Repaints Across Collin County

Night and weekend crews, bids your board can read, and one crew lead on site from wash day to walkthrough.

Current projectOffice park repaint, west Plano
ScopeStucco, metal doors, railings
Crew8 painters, 2 lifts
Hours6 pm to 2 am
FinishElastomeric, satin

Properties We Paint

Every scope below starts with a wash and a walk with your manager. Tap a photo to see it bigger.

Painters on ladders repainting townhome siding and trim in an HOA community

HOA Communities

Townhomes, fences, clubhouses and entry walls, painted in phases your budget can carry.

  • Board meeting with color boards
  • Resident notices each week
  • Phased pricing held up front
8 to 10years between repaints
Night crew under work lights repainting a strip center facade

Retail Centers

Facades, canopies and columns painted after close, so the lot is open when stores are.

  • Crews on site from 6 pm
  • Lit, taped off work zones
  • Tenant colors matched by eye and meter
7 to 9years between repaints
Painter spraying bronze paint on apartment stair railings and metal doors

Apartments and Offices

Breezeways, rails, doors and stucco for multifamily and two story office parks.

  • Rust treated before it is painted
  • One building at a time
  • Daily cleanup of every breezeway
6 to 10years between repaints

When Is Your Next Repaint Due?

Pick the wall, the sun it gets and the year it was last painted. You get a target year, the signs to watch and a price per square foot for the budget.

Main wall surface
Sun on the worst wall
Year last painted
Plan the next repaint in
2027
Due this year
20172026
Today

Signs to watch on stucco

    Price per sq ft$1.10 to $1.85
    Budget for this area$26,400 to $44,400

    Includes washing, caulk, spot prime and two coats. Wood and stucco repair are priced after a walk.

    Worker pressure washing a brick apartment wall with a long wand

    Wash Before Paint, and in the Years Between

    A yearly wash takes off pollen, red dust and mildew before they break down the finish. It is the cheapest way to push a repaint back.

    Brick and stucco
    Low pressure and a mild wash, so mortar and texture stay put
    Sidewalks and breezeways
    Surface cleaner for gum, rust and drip lines
    Dumpster pads
    Degreased and rinsed on a set schedule
    Estimator showing color sample boards to an HOA board at a clubhouse table
    Color boards at a board meeting in Frisco
    Lift crew spraying stucco on a two story office building
    Lift crew on a west Plano office park

    Where Our Crews Work

    Service area map centered on Plano with nearby cities Plano Frisco Allen McKinney Richardson Carrollton Addison Murphy Wylie US 75TollwayGeorge Bush Tpke

    Inner ring is same week bids. Outer ring is about forty minutes out, with a crew there most weeks.

    4.8
    ★★★★★96 Google reviews

    They painted 42 townhomes in three phases and every phase came in at the number they gave us two years before.

    Rachel S. HOA board, Frisco

    Night crew finished the whole center in eleven nights. Not one tenant called me to complain.

    Tom B. Property manager, Allen

    The bid was two pages and made sense. The board voted yes the same night.

    Angela M. Richardson

    Sample reviews written for this demo. Your site shows your real Google reviews, word for word.

    Questions From Managers and Boards

    Can you work nights and weekends?

    Yes. Most retail and office jobs run after close or on weekends so tenants and shoppers are not in the way. We light the work area and keep walkways open.

    Will you present the bid to our HOA board?

    Yes. We bring color boards, the full scope and a schedule to your board meeting. We answer questions and leave printed copies for anyone who could not make it.

    Do you pressure wash before painting?

    Always. Dirt, chalk and pollen stop new paint from sticking. We wash every surface first and let it dry at least a day before we prime.

    How do you handle residents and tenants during the job?

    We send notices a week ahead and again the day before. Each building gets a posted schedule, and one crew lead answers questions on site.

    What insurance do you carry?

    General liability, workers comp and auto. We send certificates with your property named as additional insured before the job starts.

    Can you break a big job into phases?

    Yes. Many HOAs paint a third of the buildings each year. We price every phase up front so the budget holds from year to year.

    Bids Out Within Five Business Days

    We walk the property, measure, and send a written scope with photos.

    Request a Bid

    Sample form for this demo. Nothing is sent.