Batch Ticket 20417
- Job
- Driveway, Wolfforth
- Load
- 9.5 yards
- Mix
- 4,000 psi
- Slab
- 5 inches
- On site
- 6:10 am
Poured Right the First Time on the South Plains
Driveways, patios, sidewalks and shop slabs in Lubbock. Packed base, rebar and joints cut where they belong.
How Much Concrete, and What Will It Cost?
Pick the job, type the size, pick a finish. You see the yards we would order, a price range and how long before you can drive on it.
Same Driveway, Two Weeks Apart
BeforeAfter
Slaton, 44 by 18 Feet
The old slab sat on sand with no rebar. Tree roots lifted it 3 inches. We tore it out, packed a new base, set rebar on chairs and poured 5 inches with a broom finish.
11.5 yards, two days of work, drove on it the next Saturday.
Estimate My PourHow Long Before You Can Use It
Concrete keeps getting stronger for weeks. Here is what you can do and when.
Summer pours start at first light. The wind out here can dry the top in minutes, so we spray an evaporation retarder as we finish.
Winter pours need 40 degrees and rising. Below that we lay curing blankets and come back to pull them.
Neighbors Who Drive on It Every Day
4.9★★★★★238 Google reviewsThey were pouring at 6 in the morning in July. Not one pop out or crack a year later.
Cody R. Wolfforth
Our stamped patio looks like real slate. They showed us how to reseal it and when.
Angela M. Ransom Canyon
The yard count on the quote matched the ticket from the plant. That told me all I needed to know.
Luis O. Lubbock
Sample reviews written for this demo. Your site shows your real Google reviews, word for word.
We Pour Across the South Plains
Lubbock, Wolfforth, Shallowater, Slaton, Idalou, Ransom Canyon, Buffalo Springs, New Deal and Levelland.
Before You Pour
The questions we answer on almost every estimate.
How soon can I drive on a new driveway?
Walk on it after a day or two. Drive a car on it after seven days. Keep trailers, RVs and heavy trucks off for 28 days, when the concrete is close to full strength.
Will my concrete crack?
All concrete cracks some. We cut control joints so it cracks in a straight line inside the joint, not across the middle of your slab. Rebar and a packed base keep the pieces from moving.
How do you pour in Lubbock wind and heat?
In summer we start at first light and use an evaporation retarder so the wind doesn't dry the top too fast. Under 40 degrees we cover the slab with blankets.
Does stamped concrete need upkeep?
Yes, a little. Plan to reseal it every two to three years. The sealer keeps the color rich and keeps water and freeze damage out.
Do you tear out the old concrete?
Yes. We break it up, haul it off to be recycled and grade the base before we form the new pour. Tear out is priced by the square foot.
Get a Firm Number on Your Slab